⎝⎛皇冠体育app⎞⎠

Manufacturer of closed cooling towers

Wuxi Ark Fluid Technology Co., Ltd.
  • National Toll Free Hotline: 400-0623-158
  • National Consulting Hotline: 0510-88552288
方舟流体
Wuxi Ark Fluid Technology Co., Ltd.

400-0623-158 Sales Hotline: 400-0623-158

0510-88552288

0510-81150707 After-sales hotline: 0510-81150707

0510-81152626 Fax Hotline: 0510-81152626

江经理13906173651 Mobile phone on duty: Manager Jiang 13906173651

2640516874 QQ: 2640516874

无锡市新吴区梅村新风路58号 Address: No. 58 Xinfeng Road, Meicun, Xinwu District , Wuxi City

next prev next

Round open cooling tower-FKY

Product Category: Open cooling tower series
    ● Beautiful appearance: small size, light weight, make full use of space and save space. Beautiful and neat appearance. ● Lightweight and high strength: The tower body is made of glass fiber reinforced polyester resin (FRP) composite materials and lightweight high-strength new materials. It can withstand a magnitude 8 earthquake, a magnitude 12 typhoon, and snow loads greater than 200kg / m2.
    0510-88552288 Order hotline: 0510-88552288

    Structural characteristics of cooling tower

    ● Beautiful appearance
    Small size and light weight, make full use of space and save space. Beautiful and neat appearance.
    ● Lightweight and high strength
    The tower body is made of glass fiber reinforced polyester resin (FRP) composite material and lightweight high-strength new materials. It can withstand a magnitude 8 earthquake, a magnitude 12 typhoon, and a snow load of more than 200 kg / m2.
    ● Minimum noise
    Adopting domestic advanced technology low noise axial flow blower and water spraying muffler technology, the noise index is at the same level.
    ● High quality packing
    The flame retardant filler is made of rigid vinyl chloride (PVC) sheet, which has been specially embossed, and the inner (fan side) edge is integrally formed. The heat exchange performance of water and air is greatly improved, and the escape of water is minimized. It is also sturdy and durable, with a heat-resistant temperature standard of 50 ° C. Has excellent environmental performance.
    各项主配件均采用热浸镀锌处理,防腐性能好,使用寿命高于同类产品。 ● Reliable and durable All main parts are treated with hot-dip galvanizing, with good anti-corrosion performance and longer service life than similar products.
    ● Design
    1) The water inlet system, water dispersion system, water collection system and heat-dissipating filling materials are calculated by scientific methods and rigorously designed to make the water flow and prevent scale from blocking.
    2) The vacuum-formed heat-dissipating material that has successfully passed the special design test has excellent heat exchange effect. The heat-dissipating material has a special flow-conducting design to prevent water splashing and flow down the heat-dissipating material only.
    3) The downwind board is used to rectify the incoming wind to make it smooth and main and has good water retaining function.



    Cooling tower structure diagram

    Equipment outline drawing (physical + structural drawing)



    Entity diagram:



    Detailed description of the structural characteristics of the open cooling tower

    (1) Cooling system
    Heat sink (Taiwan company-Formosa South Asia)
    Made of hard PVC cloth, hot-pressed or vacuum-formed, resistant to corrosion and biological erosion; three-dimensional space folded into the cavity and socket design, with extremely high water collection efficiency and extremely low air resistance, Control the drifting water loss to less than 0.0005% of the circulating water volume, conserve water resources to the limit, and prevent the spread of Legionella bacteria.



    (2) Dispersion system
    The square tower adopts a unique overflow device and sprinkler arrangement method, so that the cooling water can achieve stable and uniform water distribution under different loads of the system (the cooling water flow rate will change), and meet the system energy saving requirements.

    (3) Wind power system
    Motor
    Dedicated motor for fully enclosed air-cooled cooling tower, protection grade IP55, insulation grade F, suitable for 380V / 3Φ / 50Hz power supply.
    Fengye
    Aluminum alloy material, light weight, high strength, large air volume, low speed operation, low energy consumption, low noise and long service life. The angle can be adjusted freely according to the operating load, using the rated power to a greater extent and achieving better operating conditions.



    (4) Ontology structure
    Shell (American company-Ashland)
    Uses imported weather-resistant gel coats and colors containing anti-ultraviolet stabilizers, which are uniform in color, hard to fade, and resistant to aging. The surface is as smooth as a mirror. Round tower bottle design, square tower with rounded stripe surface design, non-reflective, to avoid light pollution.



    Construction plan

    1. Party A provides on-site installation conditions:
    (1) According to the basic diagram of the equipment provided by us, make the foundation according to the size;
    (2) Provide sufficient installation space and installation conditions, power supply, connection pipelines, general tools, field assistance personnel and dispatchers, etc.
    2. Equipment installation Our company will send someone to the site for technical guidance.
    3. Construction process:
    (1) On-site assembly after the equipment materials are in place, on-site installation of upper and lower cabinets, docking of water pipes, and installation of water pumps.
    (2) Coordination with on-site pipeline connection of Party A, flange connection
    (3) Installation of control instruments, meters and the entire control system.
    (4) Commissioning after the entire process is installed.

    Operational training

    On-site operator training after equipment commissioning includes the following:

    1. Explain the principle and operation mode of cooling tower equipment
    2.Use and maintenance of core components and main operating components
    3.Maintenance cycle of each component
    4. Maintenance methods for each component
    5.Problem handling solutions
    6. Examination of operators
    7. Return visits during the operating cycle

    Main quality control points, guarantee measures and acceptance

    Main quality control points:

    (1) Passed ISO9001-2008 quality system certification.
    (2) Strict four quality inspection passes, in line with Q / 320211AT01-2007 enterprise standards.
    (3) This series of products have been registered and filed by the State Intellectual Property Office, patent number 03316122-4.
    (4) The performance standard of the US CTI cooling tower has been adopted, and it has passed the certification.

    CTI is COOLINGTECHNOLOGIESINSTITUTE cooling technology association, which is the world's most authoritative cooling tower technology organization. CTI certification, representing 100% heat transfer capacity and performance guarantee, is an authoritative sign of cooling tower performance guarantee. To obtain CTI certification for any cooling tower, the following three conditions must be met:

    1) The cooling tower manufacturer has equipment performance test rooms that have been qualified by CTI;
    2) The independent testing organization designated by CTI conducts comprehensive performance tests on the factory products, and the results are consistent with the performance of the product sample calibration.
    3) For the certified equipment models, CTI will continue to the manufacturing plant every year, and the actual products on the production line (not the prototypes provided by the factory) will be checked randomly. Those who fail to meet the standards will be disqualified from CTI certification.
    4) CTI certification For specific factories, specific production lines and specific models of products, products produced by the same company with the same model and different origins are not certified products, and cannot indicate that the thermal performance has obtained the CTI certificate.

    Pledge

    Customer satisfaction is not just about providing good products. Ark's services also include three major measures: installation, quality tracking and warranty. In Ark's customer service center, customer files and requirements information are also stored. Every detail is for the user's sake. Users are relieved of their worries.

    1. Provide customers with operation training and equipment debugging for free, and provide technical guidance before start-up and before shutdown. Provide full technical service and support during the use of the equipment.
    2. The quantity, quality or technical specifications of the goods are inconsistent with the contract, or it is confirmed that the goods are defective. The supplier shall repair or replace the defective goods or parts free of charge after receiving the notice.
    3. After the equipment is put into operation, parts damage and quality problems occur during the warranty period, and the supplier will adjust and handle them free of charge until the customer is satisfied; outside the warranty period, the cost of parts and components will be charged.
    4.Operation or other related conditions that affect the normal operation of the cooling tower system will be answered and solutions will be given within one hour after receiving the report.
    5. Provide the latest technology of cooling towers in environmental protection and energy saving for customers to choose free of charge. During the equipment life cycle, the equipment use software should be upgraded and updated for free.
    6. The seller is responsible for the systematic free technical training of the user personnel, including the principle of equipment, fault judgment and maintenance and repair.
    7. Regular routine inspection and maintenance services.
    8. Product lifetime service system, supply parts at cost price after warranty period.
    9. We are responsible for guiding the installation of the equipment (mechanical connection, electrical connection, overall adjustment of the equipment, various functional tests of the equipment), on-site support for commissioning and trial operation, and on-site technical training.

    Hell

    Wuxi Ark Fluid Technology Co., Ltd.

    Ark Fluid Sales Headquarters:
    Sales Hotline: 0510-88552288
    After-sales hotline: 0510-81150707
    Fax hotline: 0510-81152626
    Phone on duty: 13906173651 Manager Jiang Email: 199602@3clickjob.icu

    Company Address: No. 58 Xinfeng Road, Meicun, Xinwu District, Wuxi City

    Production base:
    No. 58, Xinfeng Road, Meicun, Xinwu District, Wuxi City No. 3 Shanshui Road, Binhu District, Wuxi City, Jingji Avenue, High-tech Zone, Ji'an City, Jiangxi Province

    Directions:
    1. Bus: Take Bus No. 28 to Wuxi Railway Station and get off at New World International (Fumin Pavilion). After traveling along the bus direction for 1,000 meters, turn left at Xinfeng Road and walk 200 meters to the right;
    2. Drive: Get off at the intersection of Wuxi East Expressway,
    3. If you still have questions about the route, please contact us and we will send a car to meet you!

    Round open cooling tower Round cooling tower
    表示必填 采购:圆形开式冷却塔-FKY * Denotes required purchase: round open cooling tower-FKY
    联系人: * Contact: Please fill in your real name
    company name: Please fill in your company name
    contact number:
    手机号码: * Mobile number: Please fill in your contact phone
    e-mail:
    contact address:
    采购意向描述: * Description of purchase intention:
    的产品数量和产品描述,方便我们进行统一备货。 Please fill in the purchased product quantity and product description to facilitate our unified stocking.

    relevant information

    I want to comment:
    content:
    (Contents up to 500 Chinese characters, 1000 characters)
    Verification code: Can't see clearly? !!
    欢乐拼三张 七乐彩 欢乐拼三张 真人游戏平台注册